Concept-stage simulation for discussion with BPDB. Equipment figures are engineering assumptions pending OEM data and a feasibility study, and the 100 MW net output is not verified. Edit the assumptions at the bottom of the page and the whole plant recalculates.
Can DELTA-100 deliver 100 MW?
Model notes: engine fuel consumption follows a typical large two-stroke curve (about 170 g/kWh near full load); exhaust leaves the turbochargers at 215–260 °C and the exhaust gas boilers cool it no lower than the acid dew point setting; about 27% of engine fuel energy goes to the cooling water; HFO viscosity follows a 380 cSt grade. Benchmark from public records: Baraka Patenga, 50 MW, Tk 415 crore historical project cost, 3.2 MW waste-heat steam turbine.
DELTA-100 concept simulator. All imagery is a schematic visualization, not an engineering drawing.